Notice
Moveable dam instalation: Erie Canal Lock E8 Scotia
Notice to Mariners
Erie Canal – Scotia
June 18, 2020
Mariners are advised that the installation of the moveable dam at Erie Canal Lock E-8 (Scotia) is in progress. Please use caution in proximity of the riverbanks as fluctuating water levels east and west of Locks E-8 and E-9 (Rotterdam) may create hazardous conditions. Please be aware that no Aids to Navigation are installed on these levels.
Charts covering the affected area can be found at:
/Navigation-Informationnavinfo/charts/14786e37r.webp
Features along the eastern portion of the Erie Canal are listed by mileage at /Navigation-Information
For updates and information, please visit Canals.NY.gov or follow us on Facebook or Twitter